The goal for June was to finish the charm pack challenge quilt top and get it ready for quilting.
I think I managed to get to this point around the middle of the June, which meant I could get on with the quilting. So I have a bit of a head start on this months goal which is to finish the quilting and bind it!
Now this should be a fairly easy challenge if I could just stop doing other things! Like making Just One Slab (or 11).
Or another of the Mario blocks
Or anything else that I think 'Oh, I just have to do that '! But that's what I enjoy about this fabric obsession! So much to try and play with.
Linking up with A Lovely Year of Finishes
I think I managed to get to this point around the middle of the June, which meant I could get on with the quilting. So I have a bit of a head start on this months goal which is to finish the quilting and bind it!
Now this should be a fairly easy challenge if I could just stop doing other things! Like making Just One Slab (or 11).
Slabs |
Or another of the Mario blocks
Power Up |
Or anything else that I think 'Oh, I just have to do that '! But that's what I enjoy about this fabric obsession! So much to try and play with.
Linking up with A Lovely Year of Finishes
Your slab blocks look great. At least they are a worthwhile distraction. Cheryl is going to have some great blocks to work with.
ReplyDelete